Blog

Keep up to date with the latest from Workspace Technology

Our Knowledge Hub Articles aim to offer readers additional insights on related technology topics. If you can't locate the information you need, please feel free to reach out to us, and we'll gladly address any questions you might have.

Power Generation Offering Goes from Strength to Strength

29th, January 2013

Workspace Technology Power Generation Business goes from strength to strength with a number of significant Generator deals for projects across the UK.

Workspace Technology’s Power Generation gains further moment securing a number of high profile generator contracts in the last quarter of 2012.

Projects include Host Europe’s new Leeds data centre with 2 x 1mVA sets configured with MTU High performance engines and Stamford Alternators. With a further two units required for phase 2 and 3 during 2013 and 2014 this was an excellent end to the year.

Additional projects secured during 2012 include Poole Hospital with a 1.4mVA set, Woodhurst Diagnostic Treatment Centre with a 1.4mVA set. All the above generator sets are all synchronising and are housed within bespoke acoustic enclosures to meet the client requirements on noise level and footprint. As part of a turnkey solution all projects were also supplied with complete fuel storage and transfer systems.

For further information on Workspace Technology’s Power Generation please contact us or call 0121 354 4894.

< Return to Blog